Zesco to implement low power factor surcharge on maximum demand consumers
• The surcharge applies to customers drawing 100kVA and operating at a power factor lower than the 0.92 lagging required by law.• The authority to implement the low power factor surcharge was granted by Energy Regulation Board in 2016.• Unlike…
Continue Reading