• 12 hours of load shedding will reduce once Mamba Thermal Power Plant completes servicing the faulty 150 Megawatts Machine.• The Country is currently being
• Lake Kariba water level has been decreasing steadily on account of low inflows from the mainstream Zambezi River.• Kariba Lake is designed to operate
Zambezi River Authority says the Kariba Lake Level has closed the period under review from 18th December to 31st December 2020 at 20.08% usable storage